Problem
A modern, master-planned community in the Texas Hill Country needed a wastewater collection and treatment
system that could be installed in phases and would perform as reliably as a large municipal system, but without
the cost, odor, or need for a full-time operator.
Solution
Due to their “phase-ability” and affordability, developers of The Crossings chose an Orenco® Sewer™ and an AdvanTex® Municipal
Treatment Facility. Both collection and treatment can be installed in phases, dramatically reducing up-front capital
costs and offering homeowners a fully sewered community.